Welcome to GoldMaster

  • November 01, 2022

Precautions for using alluvial gold equipment



Precautions for using sand gold equipment:

1. Before the installation of alluvial gold equipment, relevant technical training should be given to the operators. After understanding the principle and performance of alluvial gold machinery, and familiar with the operating procedures, the operators must have a certain technical level.

2. Prepare the required maintenance tools, as well as lubrication and replacement parts before the operation of the alluvial gold equipment.

3. Before the operation of sand gold equipment, it is necessary to check the fastening condition of the fasteners of each component, and tighten it if it is loose; at the same time, it is necessary to check whether the tightness of the belt is appropriate.

4. After the alluvial gold equipment is started, it should be idling for two to three minutes, and then start the feeding work after confirming that there is no abnormal phenomenon; do not replace the pulley at will.

5. Pay attention to the operation of placer gold equipment at any time during work. It is necessary to feed materials evenly, so as to prevent clogging and stuffy cars. If vibration, noise, bearings, excessive temperature of the body, and external spraying of materials are found, stop the machine immediately for inspection and elimination. Can continue to work after failure.

6. The alluvial gold chute must be cleaned within the specified time, so as to avoid unnecessary tail running for a long time.

7. After the alluvial gold equipment is finished, it is necessary to check the condition of each component. Regular maintenance and careful use can ensure the work and bring substantial profits.


Quickly Inquiry

GoldMaster