Welcome to GoldMaster
Hopper (greater than 100mm is directly screened out) ~ less than 100mm enters the extended drum sieve ~0-6mm enters the automatic washing machine, centrifuge selection, agitation chute sweep ~6-20mm enters the agitation chute primary selection , Sweeping through the chute-throw it away if it is larger than 20mm.
Main parameters of tailings gold beneficiation equipment:
1. The design processing capacity is 150-200 tons per hour, and the water consumption is 200 cubic meters per hour.
2. Hopper: 3.6*2.2*2.5 meters.
3. Belt conveyor: 1*4 meters, motor 5.5KW electric drum.
4. Trommel screen: 1.2*5 meters, motor 11KW.
5. Automatic washing machine: 4.5*1.4 meters, motor 5.5KW.
6. Water jacket centrifuge: STL-60 type, motor 5.5KW.
7. Agitation chute: 1*3.5m, two sets, motor 1.1KW, electric hoist 0.75KW.