Welcome to GoldMaster
Mobile gold mining machinery and equipment are mainly loaded with loaders or trucks. If you're using a truck, you'll need to build a steeper ramp, or place the hopper in a lower position. Hoppers on loaders or forklifts are relatively tall. The material first enters the feeding hopper, and after passing through the drum screen, the relatively large impurities are removed, and the waste is generally transported to the place by the conveyor belt, generally 5-10 meters. The fine material leaks out from the sieve holes, and the gold selection chute is under the sieve, you can choose single chute or double chute, during the rotation of the trommel screen, there is water spray to wash the sieve and chute, the sediment is washed away, and the gold stays on the gold blanket, Waste is discharged from the trench. If sand is needed, a water wheel sand washing machine can be added. After the gold extraction machine, the gold extraction machine is easy to use and transported to the place by a conveyor belt.
The processing capacity of this kind of gold mining equipment is generally 50-100 cubic meters per hour, the diameter of the sieve is generally 1.2 meters to 1.8 meters, the length of the sieve is generally 1.5 meters to 6 meters, the chute is generally 2-4 meters, and the transportation distance is generally 5-10 meters. This kind of river sand gold mining equipment has a high gold mining rate, will not run out of the mine, and the gold mining rate can reach more than 90%; at the same time, iron powder can be used to wash yellow sand; less investment and greater income.
GoldMaster produces placer gold beneficiation equipment and placer gold beneficiation ships, and has designed and installed many equipment at home and abroad.
The gold ore beneficiation process can be understood as: the raw ore is crushed in the first stage and then enters the double-layer vibrating screen for screening. The upper layer product is re-crushed and then undergoes the second stage crushing together with the middle layer product. The second stage crushed product is returned and merged with the first stage crushed product for screening. The final product after sieving is ground by the first-stage ball mill and forms a closed-circuit grinding with the grading mechanism. The grading overflow is classified by the cyclone and then enters the second-stage ball mill for regrinding, and then forms a closed-circuit grinding with the cyclone. The overflow of the hydrocyclone is firstly subjected to priority flotation, and the foam product is subjected to secondary selection and third selection to finally become a concentrate. The separation process of three-time selection and one-time selection, the tailings of one-time selection and the foam products of one-time selection enter the cyclone for re-classification and re-separation, and the second selection and one-time selection constitute closed-circuit separation The third selection and the second selection constitute a closed-circuit selection.
The advantage of mobile gold wash plant:
1. Easy to move, integrated design, able to adapt to complex terrain in the field. For gold diggers, time and efficiency are precious.
2. It is very simple to operate, and only needs 2-3 workers to operate, which greatly saves labor costs for customers.
3. It has a large processing capacity and is equipped with the mature gold selection chute system of the University of Science and Technology, with a recovery rate of more than 90% for granular gold and capillary gold;
4. The recovery rate is high. It is equipped with an agitating chute and a fixed chute to avoid the tailing phenomenon caused by the easy hardening of the single gold grass chute, which greatly improves the recovery rate.
5. It is processed with thickened steel plate, and the screen is made of wear-resistant manganese steel screen. The matching process of the whole machine is reasonable, and the service life is greatly extended.